Climbing the Alpine Hill on I-8 at 25 MPH.
On Interstate 8...
Heading east from Alpine.
The convoy on I-8.
Approaching Sunrise Highway.
At Sunrise highway.
Crossing over Buckman Springs Road.
Dan Robirds prepping the house track.
Ian Hyatt, Rich Paulus and Diana Hyatt assisting with preparations at the Campo Depot
Preparations at the Campo Depot
Rusty Hoar with a load of ties
Rusty Hoar
Final stretch of highway
On the last part of Highway 94
On the property...
In the parking lot
Moving out over the house track
In position
Alongside the Campo Depot
Alongside the depot
Moving the wheels out of the way.
Ready to start building the ramp.
Tracks from the transporter
Wedge at the bottom of the ramp track
Rusty installing the stack
Unloading ties to build the ramp... Left to Right: Larry Rose, Dan Robirds, Rich Paulus, Ron Hyatt (on forklift) and Alex Fiori.
Ron Hyatt
Alex Fiori and Rich Paulus starting work on the ramp
Rusty Hoar trying to loosen a stubborn nut with a little help from Diana Hyatt.
Rusty torching the joint bars
Cooling the metal
Our lovely military surplus forklift
Sunset shot
Rusty and Dan Robirds working on the ramp
Torching the joint bars for the other side
Completing the ramp
Almost ready
Last minute adjustments
IMG100504740D1220703959